Ανάπλαση Πλατείων και Δρόμων στον Πυρήνα Ιδαλίου – Φάση Β2 - Restoration of Squares and Streets in the Idalion Core of Municipality – Phase B2
Αναδιαμόρφωση της περιοχής του Παττιχείου Πάρκου, στη Λάρνακα / Redevelopment of Pattichion Park Area in Larnaca
Ανάπλαση της Πλατείας Θεοσκέπαστης και Περιβάλλοντων Δρόμων στην Κάτω Πάφο – Redevelopment of Theoskepasti Square and Surrounding Streets in Kato Pafos
Ανάπλαση Παραδοσιακού Πυρήνα στην Συνοικία Αναβαργού και της Νότιας Περιοχής του Εμπορικού Παραδοσιακού Κέντρου Πάφου – Redevelopment of the Traditional Core in the Anavargos Area and of the Southern Area of the Paphos Traditional Trade Center
Πολυτελής ιδιωτική κατοικία με πισίνα στην Έγκωμη – Luxurious private house with swimming pool in Engomi
Constuction of Student Dormitories on the Site of the Former Settlement of Verengaria in the municipality of Kato Polemidia for the Cyprus University of Technology
Ενοποίηση Αρχαιολογικών Χώρων Δήμου Πάφου – Unification of Archaeological Sites of the Municipality of Paphos
Construction of S9 Pumping Station, Installation of drainage pipes and execution of auxiliary works in Larnaca»
2016-2017 - Reformation of the squares and streets around the Public Garden and in the vicinity of the Paphos Municipality Building
2015-1017 - Integrated installations for the management of municipal solid waste (IMSW) at "Pentakomo Site" located at Pentakomo Community Council
Municipal Solid Waste (IMSW) and Waste Transfer Station (WTS), Region Of Limassol (IN JOINT VENTURE WITH OTHER COMPANIES) Construction Period: 2015 - 2017
Design, Build and Operate for 10 years of the treatment plant for domestic septage, Industrial Wastewater, surplus sludge and leachate at Vati Area Construction Period: 2015 - 2018 / Operation Period: 2018 - 2028
Restoration of Uncontrolled Waste Disposal Landfills – Paphos District Construction Period: 2013-2015
Design, Build and 20 years operation of Sewage Treatment Station at Astromeritis and Auxiliary Works Construction Period: 2012-2015 / Operation Period: 2015-2035
Design, Build and 12 Months Operation of the Extension and Upgrading of Larnaca WWTP Construction Period: 2012-2014
2010-2012 - Desalination plant of 50.000m3/day capacity, including water retaining structures, industrial buildings, administration buildings, infrastructure and roads, 10km of 800mm dia ductile iron pressure pipeline & 2km of 800mm dia ductile iron gravi
2010-2012 - Reformation of Limassol's historic centre including road works, installation of underground services, urban equipment and lighting. Construction of shading structures from metal & wood
2009-2012 - Total Renovation and Maintenance of the Cyprus Conference Centre and Philoxenia Hotel for the Cyprus EU Presidency 2012
2008-2009 - Limassol Municipality, construction of square & pedestrian way and coast protection works, Akti Olympion, Limassol
2007-2009 - Extension of The Faculty of Pure and Applied Sciences Building - University of Cyprus - Nicosia
2007-2008 - Reformation of existing storage area in a four-storey building which includes a number of restaurants, coffee shops, bar, disco place, piano bar and an amphitheatre.
2006-2009 - Construction of 15 luxury villas and 48 luxurious apartments including all infrastructure, external works, private & communal swimming pools
2004-2005 - CYTA, construction of headoffice underground parking and mechanical installations, Nicosia
2004-2005 - Complete renovation of 105 rooms plus extensions including all the common areas and the external works.
2003-2004 - University of Cyprus, renovation and extension of computer buildings and laboratories, Nicosia
2001-2003 - Renovation of Existing Parliament House, Construction of a New Building & Extensions - Nicosia
1986-1992 - Construction of housing and small buildings, Nicosia 1993-1994 Mercedes Benz, extension and renovation of showroom, Nicosia